Cadence vs. Asta Powerproject.
A fair comparison. Where Cadence matches, where it differs, and where Asta Powerproject still leads.
Choose Cadence when you want deterministic CPM, resource leveling, Monte-Carlo schedule risk, EVM, and a built-in DCMA 14-point audit, free in the browser and self-hostable, without a per-user license or add-ons for risk and quality checks. Choose Asta Powerproject when you plan construction work and want a fast, Gantt-centric, construction-native programme with BIM/4D links and mobile-to-desktop site continuity, and you are fine with a per-user desktop license.
The construction planner's Gantt, met with built-in schedule audit.
Asta Powerproject, from Elecosoft, is a long-standing favorite among construction planners, used by more than 100,000 professionals. Its strength is a fast, planner-friendly, Gantt-centric interface that lets you build and reshape a programme directly on the bar chart, paired with construction-specific tooling: BIM and 4D links, mobile-to-desktop continuity for site progress, and a workflow tuned to how builders actually plan. The 2026 release adds further usability and workflow upgrades. For drawing and managing a construction programme, it is a genuinely good, purpose-built tool.
It is also a commercial desktop product, sold per user on subscription or concurrent licenses, closed-source, with schedule risk often as an add-on and no built-in DCMA 14-point quality audit. Cadence is shaped differently: free in the browser, self-hostable so your schedules stay in-house, with deterministic CPM, resource leveling, Monte-Carlo schedule risk, EVM, and a built-in DCMA 14-point audit out of the box.
Asta wins on the construction-native Gantt workflow and BIM/4D integrations; Cadence wins on price, web-native access, and getting risk and a quality audit without add-ons. They diverge on a construction-tailored desktop planner versus a free, rigorous, web-native analysis tool.
What you get by switching.
Free & self-hostable
Critical-path scheduling free in the browser; self-host so your schedules stay in-house, instead of an enterprise per-seat license.
Built-in schedule quality audit
A DCMA 14-point check is built in, the kind of audit you would otherwise buy a separate tool (Acumen Fuse) to run.
Deterministic CPM
The same network gives the same critical path and float every time, reproducible and auditable.
Risk & forecasting included
Monte-Carlo schedule risk and Earned Value Management in the base tool, not paid add-ons.
Web-native
Import or build a schedule in the browser; share it as a link rather than a license-locked desktop file.
No lock-in
Import from standard formats and own your data; no proprietary cloud your plan lives inside.
What it costs to get started.
Cadence
- Free in your browser, forever
- Self-host: $49 individual / $499 company, one-time, perpetual
- Self-hostable, offline and air-gapped
- Built-in DCMA 14-point schedule audit
- No per-seat, per-year licensing
Asta Powerproject
- Single-user subscription reported around $600–$2,000 per user per year (≈ £880/year in the UK)
- Single-user, concurrent server, and SaaS cloud licensing options
- Per-user; concurrent licenses lower the per-seat cost
- Desktop install (Windows), closed-source
- BIM/4D and some risk capabilities may be separate add-ons; verify current pricing with the vendor
Side by side.
| Capability | Cadence | Asta Powerproject |
|---|---|---|
| Price & access | ||
| Cost to start | FreeIn your browser; self-host $49–$499 one-time, no renewal | ≈ $600–$2,000 / user / yrPer-user subscription; concurrent licenses lower per-seat cost |
| Operating systems | Any OSWindows, macOS, Linux, Chromebook, anything with a browser | Windows desktopDesktop install; SaaS option available |
| Deployment | Browser or self-hostdocker compose up; air-gapped if you need it | Desktop / concurrent serverPer-machine or concurrent license |
| Where Asta Powerproject leads | ||
| Construction-native planning | General scheduler | Built for constructionWorkflow tuned to construction planners |
| Gantt-centric editing | Gantt + network views | Build on the bar chartFast, planner-friendly bar-chart UX |
| BIM / 4D integration | Not in scope | BIM + 4D sequencingLinks the programme to models |
| Field-to-office continuity | Web-native, share as link | Mobile-to-desktopCapture site progress on mobile |
| Where Cadence leads | ||
| Free & web-native | Live in the browserShare a schedule as a link, not a desktop file | Paid desktopPer-user subscription or concurrent license |
| Built-in DCMA 14-point audit | IncludedThe schedule-quality check you'd otherwise buy a separate tool (Acumen Fuse) for | NoNo built-in DCMA audit |
| Monte-Carlo schedule risk | IncludedProbabilistic dates in the base tool | Add-onRisk often a separate module |
| Earned Value Management (EVM) | IncludedCPI/SPI and variance built in | VariesDepends on edition |
| Deterministic CPM | Same critical path every timeReproducible and auditable | CPM |
| Self-host, schedules in-house | On your machine | Local desktop files |
| Core project scheduling (close to parity) | ||
| Critical Path Method (CPM) | Deterministic | CPM |
| Gantt / bar chart | Gantt + network view | Signature feature |
| Logic links & lags | FS/SS/FF/SF + lag | Full links |
| Resource leveling | Built in | Resource scheduling |
| Baselines & progress tracking | Baseline vs actual | Strong progress tracking |
| Calendars & milestones | Calendars + milestones | Calendars + milestones |
| Import an existing programme | MS Project XML / CSV | Import/export |
Where Asta Powerproject still leads.
Construction-native workflow
Built around how construction planners work, with a base used by over 100,000 professionals and a strong reputation in the sector.
Gantt-centric UX
A fast, planner-friendly bar-chart interface where you build and edit the programme directly on the Gantt, widely praised for speed.
BIM & 4D integration
Links the programme to BIM models and 4D sequencing, a real differentiator for construction sequencing and visualization.
Mobile-to-desktop continuity
Capture site progress on mobile and carry it into the desktop programme, fitting the field-to-office construction loop.
Flexible licensing
Single-user, concurrent server, and SaaS cloud options let teams size access to project needs.
When to use which.
Reach for Asta Powerproject when you plan construction work and want a fast, Gantt-centric, construction-native programme with BIM/4D links and mobile-to-desktop site continuity, and you are fine with a per-user desktop license.
Reach for Cadence when you want deterministic CPM, resource leveling, Monte-Carlo schedule risk, EVM, and a built-in DCMA 14-point audit, free in the browser and self-hostable, without a per-user license or add-ons for risk and quality checks.
Moving over? Read the Asta Powerproject migration guide →
Cadence vs. the alternatives.
Common questions.
Is there a free alternative to Asta Powerproject?
Yes. Cadence is free in your browser and built for schedule analysis: deterministic CPM, resource leveling, Monte-Carlo risk, EVM, and a built-in DCMA 14-point audit. Asta is a paid construction-native desktop planner reported from roughly $600 to $2,000 per user per year; for rigorous CPM, risk, and a quality audit, Cadence is a free alternative, though it is not a BIM/4D construction tool.
How much does Asta Powerproject cost?
Asta Powerproject is sold per user, with single-user subscriptions reported around $600 to $2,000 per user per year (about £880 per year in the UK), plus concurrent-server and SaaS options. Cadence is free in the browser, or a one-time $49 to $499 to self-host. Verify current Asta pricing with Elecosoft or a reseller.
Does Asta Powerproject run in a browser?
Asta is primarily a Windows desktop application, with a SaaS cloud option in its licensing. Cadence runs in any modern browser on any operating system, including Linux and Chromebooks, and can be self-hosted so your schedules stay in-house.
Can I move my Asta programme into Cadence?
Yes. Export your programme to Microsoft Project XML or CSV and import the activities, links, durations, and resources into Cadence. There is nothing to install. BIM/4D links do not carry over; you move the schedule itself.
What does Asta do that Cadence doesn't?
Asta leads on construction-native planning: a fast Gantt-centric bar-chart workflow, BIM and 4D model links, and mobile-to-desktop site-progress continuity. Cadence is a free, web-native scheduling and schedule-quality tool, so many construction teams keep Asta for the programme and BIM workflow and use Cadence for deterministic CPM, Monte-Carlo risk, EVM, and the DCMA audit.