From "it feels slow" to a controlled process.
A walkthrough of how a Lean Six Sigma engagement actually runs, phase by phase. This is illustrative, built to show the method, not a specific client, but every step is exactly what we do.
A process everyone agrees is "a mess".
A team runs a fulfillment process that everyone agrees is too slow and too error-prone. There are opinions about why, a system, a supplier, a shift, but no agreement, and no measurement.
That is the normal starting point. The job is not to pick the loudest theory; it is to replace opinion with a measured baseline, find the real cause, and lock in the fix. Here is how the five phases run.
DMAIC, end to end.
Agree the problem and the finish line.
We write a one-page problem statement: the process in scope, the metric that matters, the current pain, and what "fixed" measurably means. Nothing else starts until everyone signs off on this, it is what stops an engagement drifting.
Establish the real baseline.
We instrument the process and collect clean data: cycle times, defect counts, where the handoffs are. Then we run the statistics properly: a capability study to see how the process really behaves versus what it is supposed to do. This is the phase that ends the arguments.
The statistics here run on the same NIST-validated engine behind Bench, so the baseline is defensible, not a spreadsheet guess.
Prove the root cause.
With the data in hand, we separate the vital few causes from the trivial many. Often the loudest theory turns out to be a symptom, and the real driver is a single upstream step nobody suspected. We prove it statistically before we touch anything.
Redesign against the cause, and verify.
We design the change to attack the proven cause, pilot it, and re-measure. The bar is simple: the metric we defined in phase one has to move, demonstrably, before we call it an improvement. If it doesn't, we go back, not forward.
Make the gain stick after we leave.
The most common way improvements die is quietly drifting back. So we hand over a control plan: the few metrics to watch, the limits that should trigger action, and the owner. The point of the engagement is that you don't need us to hold the result.
Every claim traces to a number.
No step above rests on judgement alone. The baseline is measured, the cause is proven, the gain is verified, and the control plan is monitored. That is what "we calculate; we don't guess" means in practice, and why what we leave behind keeps working after the engagement closes.