Skip to content
Conyso Consulting
Industry · Logistics

Lean Six Sigma for logistics.

Lead-time variability, picking errors, and idle capacity compound across a network. We find the constraint, fix it, and hold the gain.

Takt
the pace each stage must match, and the variability that forces excess safety stock.
The constraint is rarely where you think
Where the waste hides

Where the network loses speed and cash.

In logistics, small inefficiencies multiply across every node and every order. The constraint is rarely where people assume.

  • Lead-time variability that forces excess safety stock
  • Picking, packing, and labeling errors that drive returns
  • Idle capacity and bottlenecks that throttle throughput
  • Demand and pace mismatches between stages
  • Cost of delay that nobody has actually quantified

How Conyso helps

Find the constraint, then the next one.

We map the flow end to end and measure where time, errors, and cost accumulate. Takt and demand analysis expose pace mismatches; variation analysis turns vague lead-time complaints into a number you can manage. The constraint, once found, gets the attention, the rest can wait.

Improvements are made and then controlled so throughput stays up after we leave. As always the math is deterministic and transparent, the standard behind Bench, so the business case is checkable.


Start free

Tools for logistics.

Deterministic, no signup, nothing leaves your browser. A useful first step before any conversation.

Talk to us

Take the variability out.

Conyso Consulting improves throughput and reliability across logistics networks, with sustained, measured results.

Talk to Conyso Consulting →


FAQ

Lean Six Sigma in logistics, answered.

How does Lean Six Sigma help a supply chain?

By reducing lead-time variability, errors, and idle capacity, it lets you cut safety stock and raise throughput without adding cost.

Where do you start in a complex network?

At the constraint. We map and measure the flow to find where time and cost actually accumulate, rather than improving everywhere at once.

How do you keep gains from eroding?

With controls and a measurement rhythm so the improved process stays improved after the project ends.


Other industries

Conyso across sectors.

Conyso Consulting →  ·  Bench →  ·  All free tools →