The 8 wastes of Lean (DOWNTIME).
The eight categories of waste Lean targets, with the DOWNTIME mnemonic, what each means, and a concrete example of where it hides.
Lean defines waste as anything that consumes resources without adding value the customer would pay for. The eight types are remembered by the mnemonic DOWNTIME. Naming them is how teams learn to see waste that has become invisible.
| Waste | What it is | Example |
|---|---|---|
| Defects | Work that has to be redone or scrapped | Rework, returns, corrections |
| Overproduction | Making more or sooner than needed | Building to forecast, not demand |
| Waiting | Idle time between steps | Approvals, queues, downtime |
| Non-utilized talent | Unused skills and ideas | Not asking the people who do the work |
| Transportation | Unnecessary movement of materials | Excess handoffs, shipping between sites |
| Inventory | More stock or WIP than needed | Buffers hiding problems |
| Motion | Unnecessary movement of people | Walking, searching, reaching |
| Extra-processing | Doing more than the customer values | Over-engineering, duplicate entry |
↓ Download as CSV · open data, free to reuse (CC BY 4.0)
The original Toyota model named seven wastes; non-utilized talent was added later, giving the eight and the DOWNTIME mnemonic.
How to cite it.
Conyso. (2026). The 8 wastes of Lean (DOWNTIME) [Data set]. Conyso. https://conyso.com/reference-eight-wastes.html
DOI: pending — Zenodo archival plannedConyso Consulting finds and removes waste on live processes, with measured, sustained results.
Learning to see waste.
Most waste is invisible because it has always been there. Naming the eight categories trains a team to spot it: the queue everyone accepts, the report nobody reads, the rework treated as normal. Once seen, much of it can be removed without new tools or spend.
The subtle one is non-utilized talent, the ideas of the people closest to the work, left unasked. It is often the largest waste and the cheapest to fix.
The 8 wastes, answered.
What does DOWNTIME stand for?
Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, and Extra-processing, the eight wastes Lean targets.
Why were there originally seven wastes?
The Toyota Production System defined seven; non-utilized human talent was added later to recognize unused skills and ideas as a major waste.
What are the eight wastes of Lean?
Defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, and extra-processing. The mnemonic DOWNTIME captures all eight, each a way resources are spent without adding value the customer would pay for.
Which of the eight wastes is the worst?
Overproduction is often called the worst because it generates the others: making too much creates excess inventory, extra motion and transportation to store it, and waiting downstream. Non-utilized talent is frequently the largest and cheapest to fix.