Little's Law reference.
The simple, powerful law linking work in progress, throughput, and lead time. What it says, how to rearrange it, and what it means for flow.
Little's Law is one of the most useful relationships in operations: the average work in progress equals the average throughput times the average lead time. It holds for any stable system, regardless of the details inside.
| Solve for | Formula | In words |
|---|---|---|
| WIP (L) | L = λ × W | Work in progress = throughput × lead time |
| Lead time (W) | W = L / λ | Lead time = work in progress / throughput |
| Throughput (λ) | λ = L / W | Throughput = work in progress / lead time |
↓ Download as CSV · open data, free to reuse (CC BY 4.0)
L = average work in progress, λ = average throughput (arrival/completion rate), W = average lead time. The law assumes a stable system over the period measured.
How to cite it.
Conyso. (2026). Little's Law reference [Data set]. Conyso. https://conyso.com/reference-littles-law.html
DOI: pending — Zenodo archival plannedConyso Consulting improves throughput and lead time on real operations, using the maths of flow, not guesswork.
What it tells you about flow.
The practical lesson is direct: to reduce lead time, either increase throughput or reduce work in progress, and the latter is usually faster and cheaper. Cutting WIP shortens lead time proportionally, which is why limiting work in progress is central to Kanban and Lean.
Example: a team completes 10 items a week (λ) and has 30 in progress (L). Average lead time W = 30 / 10 = 3 weeks. Halve the WIP to 15 and lead time falls to 1.5 weeks, with no change in capacity.
Little's Law, answered.
What is Little's Law?
A fundamental relationship for stable systems: average work in progress equals average throughput times average lead time (L = λW).
How do I reduce lead time with Little's Law?
Reduce work in progress or increase throughput. Cutting WIP is usually the faster lever and shortens lead time in direct proportion.
What is the formula for Little's Law?
L = λ × W, where L is average work in progress, λ is average throughput (the completion rate), and W is average lead time. Rearranged, lead time W = L / λ and throughput λ = L / W.
What are the assumptions of Little's Law?
It holds for any stable system over the period measured, meaning arrivals roughly equal departures and work in progress is not steadily growing or shrinking. It needs no assumptions about the order of work, the distribution of arrivals, or what happens inside the system.