OEE benchmarks reference.
The widely-cited world-class targets for Overall Equipment Effectiveness and its three components, and how to read your own number against them.
OEE multiplies Availability, Performance, and Quality into a single measure of how much of the theoretical best output a line actually achieves. These are the commonly-cited benchmark levels. The availability factor in OEE is run time divided by planned production time.
| Component | World-class | Typical |
|---|---|---|
| Availability | 90% | varies widely |
| Performance | 95% | varies widely |
| Quality | 99.9% | varies widely |
| Overall OEE | 85% | ~60% (many discrete manufacturers) |
↓ Download as CSV · open data, free to reuse (CC BY 4.0)
The 85% world-class OEE comes from 90% × 95% × 99.9%. Many manufacturers sit around 60%, so the gap to world-class is often large and worth a lot.
How to cite it.
Conyso. (2026). OEE benchmarks reference [Data set]. Conyso. https://conyso.com/reference-oee-benchmarks.html
DOI: pending — Zenodo archival plannedConyso Consulting finds the availability, performance, and quality losses behind a low OEE, and removes them.
Reading your OEE.
The 85% world-class figure is the product of its parts: 90% availability, 95% performance, and 99.9% quality. Because the three multiply, a weakness in any one drags the whole number down, which is why decomposing OEE matters more than the headline figure.
Many discrete manufacturers run around 60% OEE, often without realising it. The gap between 60% and 85% is hidden capacity you already own, no capital required.
OEE benchmarks, answered.
What is a good OEE score?
85% is the commonly-cited world-class benchmark, from 90% availability, 95% performance, and 99.9% quality. Many manufacturers run nearer 60%.
What is the availability formula in OEE?
Availability = run time / planned production time. The world-class availability benchmark is about 90%, meaning the line runs 90% of its scheduled time.
What is a world-class availability in OEE?
Around 90%. Availability captures uptime losses (breakdowns, setups, and changeovers) as run time divided by planned production time.
Why decompose OEE into three parts?
Because the components multiply, so a single weak factor caps the whole score. Decomposing it shows exactly where the lost output is.