Process capability calculator.
Enter a mean and standard deviation, or paste your raw measurements. Get Cp, Cpk, Pp, Ppk, the estimated defect rate, and sigma level with a live capability plot. Deterministic, no signup, and nothing you type leaves your browser.
Leave LSL or USL blank for a one-sided spec. Enter your within-subgroup σ for Cp/Cpk, or your overall σ for Pp/Ppk. The defect rate assumes a normal distribution.
The mean and standard deviation are computed from your data (overall σ, so these are Pp/Ppk). The plot is drawn by Lens.
Bench plots your distribution against the spec limits, checks normality, runs the full capability sixpack, and writes the interpretation. Free, in your browser, no signup.
What Cp and Cpk actually measure.
Cp measures whether your process could fit inside the spec limits: the spec width divided by six standard deviations, Cp = (USL − LSL) / 6σ. It ignores where the process is centered.
Cpk measures whether it does: the smaller of the distances from the mean to each spec limit, in units of 3σ. Cpk = min[(USL − µ)/3σ, (µ − LSL)/3σ]. A gap between Cp and Cpk means the process is off-center, and re-centering, not tightening, is the cheaper fix.
The conventional bar is Cpk ≥ 1.33 (capable) and 1.00 as the floor. Below 1.0, the process is producing out-of-spec parts at a rate worth costing. The DPMO and sigma figures translate Cpk into a defect rate assuming normality.
This calculator runs the same deterministic math as Bench. Bench adds the distribution plot, normality checks, capability sixpack, and a plain-English interpretation, all free in your browser.
What is a good Cpk?
A quick reference for a centered process (short-term, without the 1.5σ shift). The defect rate climbs fast as Cpk falls below 1.33.
| Cpk | Sigma level | Defect rate (DPMO) | Yield | Verdict |
|---|---|---|---|---|
| 0.67 | 2.0σ | 45,500 | 95.45% | Not capable |
| 1.00 | 3.0σ | 2,700 | 99.73% | Minimum |
| 1.33 | 4.0σ | 63 | 99.9937% | Capable |
| 1.67 | 5.0σ | 0.6 | 99.99994% | Excellent |
| 2.00 | 6.0σ | 0.002 | ~100% | World-class |
Most industries target Cpk ≥ 1.33; safety-critical work often requires 1.67 or higher. A centered six-sigma process has Cp = Cpk = 2.0.
Process capability, answered.
What is a good Cpk value?
1.33 is the conventional bar for a capable process and 1.00 is the practical floor. Safety-critical processes often require 1.67 or higher. Below 1.0, the process is producing out-of-spec output at a rate worth costing.
What is the difference between Cp and Cpk?
Cp measures whether the process spread could fit inside the spec limits, ignoring centring: (USL − LSL) / 6σ. Cpk also accounts for where the process is centered, taking the smaller of the two one-sided indices. If Cp is much larger than Cpk, the process is off-center and re-centring will improve capability.
What is the difference between Cpk and Ppk?
Cpk uses the within-subgroup (short-term) standard deviation; Ppk uses the overall (long-term) standard deviation. The formulas are identical. When you paste raw data here, the tool computes the overall σ, so those numbers are strictly Pp and Ppk.
Does a high Cpk mean zero defects?
No. Cpk assumes a normal, stable process and estimates a defect rate that never reaches zero, and Cpk 1.33 still implies roughly 63 defects per million. And if the process is not in statistical control, Cpk describes a distribution that does not exist; fix stability first.
How do you calculate Cpk?
Cpk = min[(USL − mean) / 3σ, (mean − LSL) / 3σ]. The calculator above does this and also estimates the defect rate (DPMO) and sigma level assuming a normal distribution.
Is this Cpk calculator free?
Yes, completely free and with no signup. It runs entirely in your browser, so nothing you type is sent anywhere. For the full capability study (distribution plot, normality test, sixpack) open the same analysis in Bench, also free.