Put three items side by side, each with the value it loses every week it is late and how long it takes. CD3 divides cost of delay by duration to rank them, so the work that returns the most value per week of effort rises to the top. A short, urgent item can beat a long, expensive one.

Item 1
Item 2
Item 3

CD3 = cost of delay per week ÷ duration in weeks. The highest CD3 goes first: it returns the most value per week of effort.

— do first
Top CD3 —
Enter values to rank.
What this number is not Cost of Delay figures are estimates, useful for relative ranking, not precise budgeting. A hard deadline breaks the linear-cost assumption, so use CD3 to order a queue, not to promise a number.
Sequence the whole plan, not three items.

CD3 orders a queue. Cadence schedules it: critical path, resource levelling, and Monte-Carlo risk, so the do-first list becomes a dated plan you can defend.

See Cadence →

How it works

The method.

Each item carries two numbers: its Cost of Delay, the value lost for every week it slips, and its Duration, how many weeks of effort it takes. CD3 divides one by the other, cost of delay per week over duration, to get value returned per week of work.

Rank the items by CD3, highest first. That single ratio settles a common tug of war: a big, slow item with a large total cost can still lose to a small, urgent one that finishes fast and clears the queue.

The chart draws the three CD3 scores as ranked bars, highest on top, so the order to work in is obvious at a glance. Names are optional; blank ones fall back to Item 1, 2, 3.

CD3 →
Ranked by value returned per week of effort.

The formula

The maths, in the open.

CD3 = cost of delay per week ÷ duration in weeks

Worked example. Item A loses 10,000 a week and takes 2 weeks, so its CD3 is 10,000 ÷ 2 = 5,000. Item B loses 8,000 a week and takes 1 week, so its CD3 is 8,000 ÷ 1 = 8,000. B has the lower weekly cost of delay yet the higher CD3, so B goes first: it returns more value per week of effort and clears the queue sooner.


Watch out

Common pitfalls.

The ranking is only as honest as the estimates. Guessing a cost of delay ten times too high buys an item priority it has not earned. CD3 also assumes cost accrues steadily; a fixed deadline changes everything, because before the date the cost may be near zero and after it the value can drop off a cliff. Treat CD3 as a way to sort a backlog, not as a substitute for judgement about deadlines and dependencies.


FAQ

Cost of Delay, answered.

What is Cost of Delay?

Cost of Delay is the value you lose for every week a piece of work is late: revenue not earned, savings not captured, risk not retired. It turns a fuzzy sense of urgency into a number per week.

What is CD3?

CD3 is Cost of Delay Divided by Duration. It measures value returned per week of effort, so a cheap high-urgency item can outrank an expensive one. It is the WSJF idea in its simplest form.

Why divide by duration?

Because time is the scarce resource. Two items may lose the same per week, but the one that finishes sooner frees the queue faster, so it should go first. Dividing by duration captures that.

Does the highest Cost of Delay always go first?

No. A short item with a lower weekly cost of delay can beat a long one with a higher cost, because it returns value faster. That is exactly what CD3 surfaces.

Is this calculator free?

Yes, free and no signup, running entirely in your browser.



Embed this calculator

Put it on your site, free.

A clean, responsive widget that runs in your visitor's browser, no signup. Pick an accent to match your brand, then copy the snippet. The Conyso mark stays on the widget.

Accent
Powered by Conyso.