Sprint velocity calculator.
Paste the story points your team finished in recent sprints, and optionally the backlog still to go. See your average velocity, how steady it is, and how many sprints the backlog is likely to take, as a range, not a date.
List each finished sprint's completed points, separated by commas, spaces, or new lines. Use at least three sprints for a stable average.
A velocity number is a starting point. Cadence turns it into a resource-levelled schedule with Monte-Carlo risk, so your forecast is a defensible range, not a guess.
The method.
Velocity is the average story points a team completes per sprint. Average several recent sprints rather than one, because a single unusual sprint distorts the picture. The spread of those sprints, the gap between your best and worst and the standard deviation, tells you how much to trust the average.
To forecast, divide the remaining backlog by your average velocity and round up. A steady team gets a tight forecast. An erratic team gets a range: divide by your best sprint for the optimistic end and your worst for the pessimistic end.
Use it within one team only. Story points are calibrated to each team's own estimation, so comparing velocities between teams is meaningless and usually corrosive.
The maths, in the open.
velocity = total completed points / number of sprints · sprints to finish = ⌈ backlog / velocity ⌉
Worked example. Sprints of 23, 20, 25, 18, 27, 22 total 135 over 6 sprints, so velocity averages 22.5 points, ranging from 18 to 27. A 90-point backlog divided by 22.5 is exactly 4, so about 4 sprints to finish. On the best sprint of 27 that is closer to 4 too, on the worst of 18 it stretches to 5.
Common pitfalls.
Do not compare velocity between teams, points are calibrated per team. Do not treat it as a target: pressure to raise velocity just inflates estimates without delivering more. And do not read a single forecast date off a wide, erratic history, treat the optimistic and pessimistic ends as the honest bounds.
Sprint velocity, answered.
What is sprint velocity?
The average number of story points a team completes per sprint. It is used to forecast how long a backlog will take, not to compare teams.
How many sprints should I average?
At least three, and ideally the last five to eight, so a single unusual sprint does not skew the number.
How do you forecast sprints to finish a backlog?
Divide the remaining backlog points by your average velocity and round up. A wide spread in past sprints turns that into a range: divide by your best sprint for the optimistic end and your worst for the pessimistic end.
Why shouldn't I compare velocity between teams?
Story points are relative to each team's own estimation, so one team's 30 is not another's 30. Velocity is only meaningful within a team.
Is this calculator free?
Yes, free and no signup, running entirely in your browser.