Enter available production time and customer demand to get takt time, the heartbeat your line must match. Add your actual cycle time and see at a glance whether you can keep up. It is the demand pace, not a target to beat.

Takt time = available time / customer demand. Keep both in the same period. Cycle time must stay at or below takt to keep up.

— takt time
Required rate —
Enter values to calculate.
What this number is not Takt is the demand heartbeat, not a target to beat: running faster just builds inventory. It assumes steady demand, so recalculate it per period when demand is seasonal.
Pace the whole plan, not just the line.

Takt sets the beat for one station. Cadence schedules the whole build, deterministic critical path, resource leveling and risk, so the plan holds when demand shifts.

See Cadence →

How it works

The method.

Takt time is the pace demand sets: net available working time divided by the units customers want in that same window. It is the heartbeat a line must match, no faster (you build inventory you did not need) and no slower (you fall behind demand).

Pick a time unit, enter the available time and the demand, and takt falls out directly. Add your actual cycle time and the calculator compares the two: cycle time at or below takt means you can keep up, cycle time above takt means you cannot.

The bar makes it visible. Takt is the reference; the cycle bar turns red the moment it crosses above takt, so overburden is obvious before it reaches the floor.

taktcycle
Cycle time above takt: the line cannot keep up.

The formula

The maths, in the open.

takt time = net available production time / customer demand

Worked example. An 8-hour shift is 28,800 seconds of available time. With demand for 480 units, 28,800 / 480 = 60 seconds per unit. If your actual cycle time is 55 seconds you keep up with room to spare; at 70 seconds you cannot meet demand and need to close the gap.


Watch out

Common pitfalls.

Using gross time instead of net available time (after breaks and planned stops) gives a takt that is too generous. Takt is not cycle time: your actual cycle time must stay at or below takt to keep up. And takt assumes steady demand, so seasonal or spiky demand has to be recalculated per period rather than averaged across the year.


FAQ

Takt time, answered.

What is takt time?

The pace of production needed to meet customer demand: available working time divided by the number of units demanded in that time.

What is the takt time formula?

Takt time = net available production time / customer demand. For example, 28,800 seconds available divided by 480 units is a takt time of 60 seconds per unit.

How do you calculate takt time?

Divide the net available working time in a period (after breaks and planned stops) by the number of units customers demand in that same period. Keep the time and the demand in the same window.

What is the difference between takt time and cycle time?

Takt is the required pace set by demand; cycle time is your actual time per unit. Cycle time must be at or below takt to keep up. If cycle time is above takt, you cannot meet demand.

Is this calculator free?

Yes, free and no signup, running entirely in your browser.



Embed this calculator

Put it on your site, free.

A clean, responsive widget that runs in your visitor's browser, no signup. Pick an accent to match your brand, then copy the snippet. The Conyso mark stays on the widget.

Accent
Powered by Conyso.