Skip to content
Conyso.
Cadence · Founded 2026

Cadence vs. Microsoft Project.

A line-by-line comparison. Where Cadence matches, where it differs, where Project still leads.

See it in Cadence

The free tool, running its own sample.

About Cadence →

The sample project, Aurora Office Fit-Out: the activity table pinned left, the critical path in red.
The sample project, Aurora Office Fit-Out: the activity table pinned left, the critical path in red.
The same schedule scored against the DCMA 14-point standard, with every failing check named and measured.
The same schedule scored against the DCMA 14-point standard, with every failing check named and measured.
The honest version

Familiar, but not built for serious CPM.

Microsoft Project is the tool almost everyone has opened at least once. It is widely deployed, sits inside the Microsoft 365 / Teams / SharePoint world that organizations already run on, and carries decades of templates, add-ins, and familiarity. For a task list everyone recognizes, it is hard to beat, and this page does not pretend otherwise.

For serious scheduling the picture is different. Real critical-path quality checks, a DCMA score, and Monte-Carlo risk all live in third-party add-ins around Project, not in the box. The desktop product is Windows-centric, while Project for the web is a separate, lighter product. Files are .mpp and XML that need a license to open. Cadence gives a real CPM engine, a built-in DCMA audit, Monte-Carlo risk, earned value, and forensic delay analysis, free, in any browser, on open formats. The trade-offs are real in both directions. This is the map.


Where the categories fall

Six wins that aren't about familiarity.

Free & open

Free in your browser, against a paid Microsoft 365 / Project subscription. No seat math, no Microsoft account, no Windows requirement.

Browser-native

Any modern browser, or one docker run behind your own firewall. No desktop install, and not split between a heavy Windows app and a lighter web product.

DCMA audit built in

The 14-point schedule-quality assessment, scored 0 to 100 with per-check findings, shipped in the box. Around Project that audit needs a separate add-in.

Risk & delay, included

Seeded Monte-Carlo risk and forensic delay analysis are built in. With Project, Monte-Carlo means a third-party add-in such as @RISK or Full Monte, and delay work is manual.

Deterministic & reproducible

A pure-function engine recomputed on demand, seeded risk, 43 automated tests, and source you can read. Same inputs, same outputs, every time, with no AI in the math.

Open formats & sharing

Reads and writes MS Project XML and .xer, exports open JSON, and mints a read-only share link or a self-contained HTML report. Your file is never held hostage.


Pricing & access

What it costs to get started.

More about Cadence →

Cadence

Free
in your browser · self-host with one docker run
  • Free in your browser, forever
  • Self-host with one docker run, no cost
  • Self-hostable; your data stays in-house
  • Your schedules stay in-house when self-hosted
  • No login, no seats, no telemetry

Microsoft Project

Subscription
A paid Microsoft 365 / Project subscription.
  • Project desktop is Windows-centric
  • Microsoft account required
  • Closed-source, commercial
  • Project for the web is a separate, lighter product
  • Part of the wider Microsoft 365 stack

Feature comparison

Scheduling capability, side by side.

Capability Cadence Microsoft Project
Cost & access
Price FreeFree in the browser, self-hostable, no seats SubscriptionA paid Microsoft 365 / Project subscription
Platform Any modern browser Windows desktopProject for the web is a separate, lighter product
Self-hosting One docker run NoDesktop install or Microsoft-hosted cloud
Login required None Microsoft account
License Perpetual self-host license Commercial, closed
Critical-path engine
Relationship types All four (FS / SS / FF / SF) All four (FS / SS / FF / SF)
Lags & leads Yes Yes
Date constraints Yes Yes
Total & free float Both, reported clearlyTotal and free float surfaced on every task BothComputed, but less surfaced in the default view
Cycle (loop) detection Yes Yes
Per-activity calendars YesPart-time, six-day, or 24/7 working calendars per activity Yes
Familiar UX & switching cost
Pinned activity table + Gantt YesA pinned spreadsheet of activities beside the Gantt, the layout schedulers expect Yes
Activity IDs & type-able predecessors YesActivity IDs (A1000) and predecessors typed the P6 way (A1010FS+2) Row-number styleTask IDs and predecessors by row number, not P6 Activity-ID relationship strings
Right-click menus, Tab-to-indent WBS Yes Yes
Interactive network logic editor (drag-to-link) YesBuild relationships by dragging one activity to another Network Diagram view
Switching cost / retraining Near-zeroFamiliar muscle memory; the same way to schedule, minus the license N/A, the incumbent
Resource management
Resource leveling Yes Yes
Loading curves Yes Yes
Time-phased availability Yes Yes
Schedule risk
Monte-Carlo, built in Yes, seeded & reproducibleIn the box; same seed, same result, every time NoNeeds a third-party add-in such as @RISK or Full Monte
P10 / 50 / 80 / 90, S-curve, tornado, criticality YesConfidence percentiles, S-curve, tornado, and criticality index In an add-in
Integrated cost risk Yes In an add-in
Earned value
SPI / CPI / EAC Yes Basic EVM fieldsCore earned-value fields exist, less complete than a dedicated read
PV / EV / AC curves YesAgainst a baseline, on the same screen as the schedule Tables, limited curves
Schedule quality audit (DCMA 14-point)
Built-in 0 to 100 score YesAll 14 checks scored 0 to 100, in the box NoNeeds a separate add-in such as Acumen Fuse
Per-check findings & fix guidance YesPlain-language verdict per check, with the exact tasks to fix No
Forensic delay analysis
TIA / but-for / windows Built inTime Impact Analysis, collapsed as-built (but-for), and windows, the AACE 29R-03 family NoManual, or a separate forensic tool / engagement
Schedule comparison / diff YesDiff two .xer: finish movement, quality change, slips, scope churn Compare-versions add-in
Openness & sharing
Import .xer Yes Via conversionNot native; needs an intermediate XML / converter
MS Project XML in / out Yes Yes
Open JSON export YesPlus CSV; the whole schedule in a format anything can read No
Read-only share link Yes Via the cloud product
Self-contained HTML report YesOne file the client opens without a license No
Trust & determinism
Deterministic recompute YesPure-function engine recomputed on demand, no stale cache Recalculation engine
Plain-English interpretation YesVerdicts, findings, and an executive summary, rule-based from the computed numbers No
No-AI math YesEvery number is deterministic; nothing a model invented Deterministic
Self-hostable Self-host licenseRuns on your own infrastructure Closed
Automated tests 43, published Internal, unpublished
Ecosystem & integration
Ubiquity & familiarity New (2026) YesAlmost everyone has used Project at least once
Office / Teams / SharePoint integration NoIntegrates by reading and writing open files instead YesDeep ties into Microsoft 365, Teams, and SharePoint
Cloud portfolio & resource management Single-tenantBuilt for a serious CPM programme, not an organization-wide portfolio YesProject Online / Project for the web at organization scale
Multi-user cloud co-authoring Single-tenant YesIn the cloud product
Template & add-in ecosystem Open formats VastA large market of templates and add-ins
Installed base & years New (2026) DecadesDeep installed base and familiarity

The honest column

Where Project still wins.

Project's strongest card is reach. Almost everyone has used it, it is widely deployed, and it sits inside the Microsoft 365, Teams, and SharePoint world that most organizations already run on. For a simple task list everyone recognizes, that familiarity is real value, and Cadence does not try to replace it.

The cloud side, Project Online and Project for the web, also brings organization-scale portfolio and resource management and multi-user co-authoring that Cadence, single-tenant by design, does not. Add a vast template and add-in ecosystem and decades of installed base, and Project remains the default many teams reach for. Cadence is new, and honest about that.

The honest column

Where Cadence wins.

Cadence is free, browser-native, and self-hostable, with one docker run to self-host behind your own firewall. The DCMA 14-point audit, seeded Monte-Carlo risk, earned value, and forensic delay analysis are all built in, where the Project world splits those across third-party add-ins such as @RISK, Full Monte, or Acumen Fuse.

It reads and writes open formats (MS Project XML, .xer, JSON, CSV), mints read-only share links and self-contained HTML reports, and every number is deterministic and reproducible, backed by 43 published tests. You can audit a submitted schedule, forecast a finish date, or self-serve a delay analysis without a license, an install, or a Microsoft account.


Decision

When to use which.

Use Microsoft Project when

You want Office and Teams integration, organization-wide portfolio and resource management, multi-user cloud co-authoring, or a simple task list that everyone already knows. That familiarity and ecosystem are what it is built for.

Use Cadence when

You need a real CPM programme with a DCMA score, Monte-Carlo risk, earned value, and delay analysis, free, in a browser, on open files. Author, level, score, and forecast a schedule, or audit a submitted one in seconds.

Use both when

Cadence reads and writes MS Project XML, so the two coexist. Keep Project for the day-to-day and the Office integration, and bring the schedule into Cadence to score it, run risk, or build a delay analysis, then export it back.


Try Cadence

Open a real schedule in ten seconds.


Comparison written by Conyso Labs, 2026. Microsoft Project is a trademark of Microsoft Corporation. This page is not affiliated with or endorsed by Microsoft.


FAQ

Questions, answered.

Is Cadence a free alternative to Microsoft Project?

Yes for critical-path scheduling, resource levelling, earned value and a DCMA 14-point schedule audit, free in the browser, and it imports MS Project XML. MS Project has broad task management and Office integration; Cadence focuses on the critical path and schedule quality without a licence.

Can I import my MS Project file?

Yes. Cadence reads MS Project XML and Primavera .xer, and exports open formats plus a share link.

Does Cadence audit schedule quality?

Yes, against the DCMA 14-point standard, 0 to 100 with a verdict per check, which MS Project does not do out of the box.

Is there anything to install?

No. It runs in the browser free; self-host for a one-time licence.

When is MS Project the better fit?

For general task and resource management inside the Microsoft ecosystem. Cadence is for forensic critical-path scheduling and a DCMA audit.