Free CPM project scheduler with DCMA 14-point audit.
Critical-path scheduling, resource leveling, Monte-Carlo risk, earned value, and forensic delay analysis, with a built-in DCMA 14-point quality audit. No LLM, no install, no login.
Compare against▾
One page does what five products do.
Each of these is a separate, expensive, mostly-desktop product. Cadence does them in a single browser tab, free, with every number reproducible and your file never held hostage.
Real scheduling is locked behind price, platform, and proprietary files.
Primavera P6 is powerful, but it runs thousands of dollars per seat per year, it's Windows-bound, and it's heavy. Most teams can't justify it, so they fall back to a Gantt tool that has no real critical path, no float, and no quality checks.
The schedule-quality audit owners increasingly mandate, the DCMA 14-point assessment, is a separate paid tool of its own. And the whole programme lives in a .xer or .mpp that nobody can open without a license.
So we built the opposite: deep and free and browser-native, on open formats, with the audit built in.
Import or build. Audit. Forecast, and share.
Bring a schedule in or build one on a real CPM grid, and Cadence computes float properly — surfacing the critical path, the zero-float chain that sets your finish date, while everything else carries slack.
1 · Bring your schedule
Import a Primavera .xer, MS Project XML, or CSV; start from a template; or build from scratch on a real CPM grid and Gantt, with four relationship types, lags and leads, constraints, calendars, and float computed properly.
2 · Audit it
Get an instant DCMA 14-point score, 0 to 100, with per-check findings and exactly what to fix. The audit Acumen Fuse sells separately, built in and free.
3 · Forecast and share
A P80 finish date from seeded Monte-Carlo, earned value against a baseline, and a delay analysis, then a read-only share link or a self-contained HTML report for the client.
The DCMA 14-point audit, built in.
The schedule-quality standard owners and PMOs increasingly require, implemented in full and scored 0 to 100, with a plain-language verdict for every check and the exact tasks to fix. Drop in an .xer and read the score in ten seconds.
Depth that usually costs thousands.
Schedule risk (Monte-Carlo)
P10/50/80/90 finish dates, a confidence S-curve, criticality and a tornado chart, and integrated cost risk, seeded so it's reproducible. Risk analysis you'll actually run, because it's free and built in.
Earned value
SPI, CPI, EAC and the PV / EV / AC curves against a baseline. The progress maths a board expects, on the same screen as the schedule.
Deadline-recovery advisor
When you're running late, Cadence tells you exactly how many days you need to claw back and which activities to compress to get there. The recovery plan, computed, not guessed at.
Forensic delay analysis
Time Impact Analysis, collapsed as-built (but-for), and windows analysis, the AACE 29R-03 family. Self-serve the analysis you'd normally commission as a consulting engagement.
Resource leveling, curves & calendars
Loading curves, time-phased availability, and per-activity working calendars, part-time, six-day, or 24/7. Level the plan against the people and machines you actually have.
Schedule comparison
Diff two .xer files, finish movement, quality change, slips, and scope churn. Answer “what changed since last month?” in one click instead of by hand.
Critical path, done right
Four relationship types with lags and leads, date constraints, total and free float, and cycle detection. A real CPM engine, not Gantt bars with dependencies drawn on.
Plain-English interpretation
Cadence reads your schedule back to you in plain words: the verdict, the chief concern, and what to do about it, generated from the computed numbers, not an AI guess. It explains itself.
Open & shareable
Import .xer / MS Project XML / CSV; export open JSON, CSV, .xer, MS Project XML, and a self-contained HTML report; mint a read-only /share/ link you hand a client or PMO, no login required. Your file is never hostage.
Muscle memory from P6 and MS Project.
If you've used Primavera P6 or Microsoft Project, Cadence already feels like home. A pinned activity table beside the Gantt, Activity IDs (A1000, A1010), and predecessors you type the way you already do (A1010FS+2). Right-click menus where you expect them, Tab to indent a WBS, and an interactive network-logic editor you build by dragging one activity to another to link them.
The point is a near-zero switching cost. Nobody has to learn a new way to schedule. They just stop paying for the license.
Every number is reproducible. None of it is a guess. Same inputs, same outputs, every time.
No model deciding your finish date.
Cadence is pure maths, computed by a pure-function engine that recomputes on demand, so there's no stale cache and no black box. The plain-English read is rule-based, generated from the computed results, so the prose is exactly as trustworthy as the engine underneath it. Backed by 43 automated tests.
For a compliance-minded audience, the absence of AI is the feature: a schedule score you can defend is one a model didn't invent. An optional AI assistant can sit on top later for those who want it, without ever touching the math.
It's the same standard as the rest of Conyso Labs: Bench reads a process, Lens draws the data, Ledger reads a company, and Cadence runs the schedule. Four deterministic tools, one promise.
Free in the browser. Yours to keep, self-hosted.
Run the hosted demo on a sample project right now, free. Self-host when your schedules need to stay in-house, a one-time license, perpetual.
Free in your browser. Self-host from $49 individual or $499 company, one-time and perpetual, the same simple model across every Conyso Labs tool. See full pricing & license →
A one-time, perpetual self-host license — run it behind your own firewall, offline, so schedules never leave your network. Single-tenant by design, ideal for a team or a firm. Honest about scope: it isn't a 1,000-seat multi-tenant PMO platform, and we'd rather say so than pretend.
Find your lane.
Owner's reps & PMO reviewers
Vet a contractor's submitted programme. Drop the .xer in and get a 0 to 100 DCMA score plus findings, no separate Acumen license.
Planners & schedulers
Build and maintain a real CPM programme with leveling, risk, and EVM, when you can't justify P6 and MS Project is weak and Windows-bound.
Claims & forensic consultants
Prove or rebut a delay. Self-serve Time Impact Analysis, but-for, and windows, instead of a manual, billable build each time.
Contractor PMs in a dispute
Understand what changed between revisions. Compare two .xer files and see finish movement, slips, and scope churn at a glance.
Students & trainers
Learn DCMA and CPM properly, free, with a plain-English explanation of every check and every number.
Small & mid contractors
Run a serious schedule without an enterprise license or an IT project. One browser tab, or one Docker command behind your own firewall.
How Cadence compares.
The honest maps, line by line, against the tools Cadence folds in.
Before you try it.
Is it really free? Yes, in the browser, no seats, no login. Self-hosting is a one-time license, $49 for an individual, $499 for a company, perpetual, so your data stays in-house.
Can it open my Primavera file? Yes, .xer in and out, plus MS Project XML and CSV. You're never locked in.
Does my data leave my machine? Self-host and nothing leaves your network. The public demo is a shared sandbox for trying it, don't put confidential schedules there.
Is there AI? No. Every result is deterministic maths; the plain-English read is rule-based. An optional assistant may sit on top later, without touching the numbers.
Will it scale to a 1,000-seat enterprise PMO? Not yet, and we won't pretend. It's single-tenant by design, great for a team or a firm, not a multi-user governance platform.
How accurate is the DCMA scoring? It implements the published 14-point standard, and shows the maths per check, so you can see exactly how each score was reached.
Open a real schedule in ten seconds.
Part of the Conyso ecosystem. Conyso. ↗
Questions, answered.
Is Cadence a free alternative to Primavera P6 or MS Project?
Yes. Cadence builds a critical-path programme, levels resources, runs Monte-Carlo risk and earned value, and audits the schedule against the DCMA 14-point standard, free in your browser. It imports Primavera .xer and MS Project XML, so you can bring an existing plan.
Can I import my existing schedule?
Yes. Cadence reads Primavera .xer and MS Project XML and exports open formats, plus a read-only share link.
Do I need to install anything?
No. It runs in the browser with no signup; self-host for a one-time licence when programme data must stay in-house.
What is the DCMA 14-point audit?
A schedule-quality standard: Cadence scores your programme 0 to 100 across the 14 checks with a plain-English verdict per check, the same assessment that tools like Acumen Fuse sell.
Does Cadence use AI in the scheduling maths?
No. Critical path, resource levelling, earned value and the audit are all computed by deterministic code, reproducible from a documented algorithm.