What is a good RPN?
The risk priority number, or RPN, is the product of severity, occurrence, and detection ratings in an FMEA, and there is no universal threshold that makes an RPN good.
What the numbers mean.
| Range | Rating | What it means |
|---|---|---|
| High severity, any occurrence | High priority | Address regardless of the RPN product; safety cannot be averaged away |
| High occurrence and weak detection | High priority | Frequent, hard-to-catch failures need action even at moderate severity |
| Moderate ratings across the board | Medium priority | Review and act where reasonable; document the rationale |
| Low severity, low occurrence, strong detection | Low priority | Acceptable as is; record and monitor |
| Any RPN compared to a fixed cutoff | Invalid | A single threshold hides dangerous high-severity, low-product risks |
How the benchmark is set.
RPN was for decades the headline output of an FMEA. Each failure mode is scored one to ten for severity, one to ten for how often it occurs, and one to ten for how likely it is to be detected, and the three are multiplied to give a number from one to one thousand. The intuitive appeal was that teams could sort by RPN and work down the list, and many organisations set a cutoff, say 100, above which action was mandatory. That practice is now widely recognised as flawed.
The problem is that multiplication treats very different risks as equal. A failure with severity 10, occurrence 2, and detection 5 scores 100, exactly the same as one with severity 4, occurrence 5, and detection 5, yet the first can injure a user and the second is a nuisance. Worse, a catastrophic failure that is rare and detectable can produce a low RPN and slip under a threshold, which is precisely the risk that most needs attention. The number also invites false precision from ordinal ratings that cannot legitimately be multiplied.
For these reasons the 2019 AIAG-VDA FMEA handbook retired RPN as the primary decision tool and introduced Action Priority. Action Priority uses a published table that maps each combination of severity, occurrence, and detection to High, Medium, or Low priority, with severity given proper weight so that dangerous failure modes cannot be averaged into insignificance. The question is no longer whether an RPN is good but whether risks are correctly prioritised and the high ones acted upon.
How to improve it.
To use FMEA well, adopt Action Priority instead of an RPN cutoff. Start from severity, ensure every high-severity mode has a mitigation regardless of how rarely it occurs, and use the AP table to sort the rest. Reduce occurrence through design and process changes and improve detection through better controls, then re-evaluate. Document why each high and medium item was or was not actioned, because the audit trail, not the raw number, is what demonstrates a sound risk decision.
Common mistakes.
The defining pitfall is a fixed RPN threshold, which lets a rare catastrophic failure escape action while forcing effort onto trivial modes that happen to multiply high. Related errors are treating ordinal ratings as if they were measured quantities, inflating detection scores to duck action, and comparing RPNs across different FMEAs whose scales were calibrated differently. Never present a low RPN as proof of safety when a high severity rating sits inside it.
Common questions.
What is a good RPN threshold?
There is no valid universal threshold. A fixed cutoff lets rare but catastrophic failures escape action, which is why the AIAG-VDA standard replaced RPN with Action Priority as the primary decision tool.
Why was RPN replaced by Action Priority?
Because multiplying three ordinal ratings treats very different risks as equal and can hide high-severity failures behind a low product. Action Priority weights severity properly and sorts risks into High, Medium, and Low.
Is RPN still allowed in an FMEA?
It can be recorded for continuity, but it should not drive decisions. The current guidance is to prioritise using the Action Priority table and to act on all high-severity modes regardless of their RPN.
How does Action Priority work?
A published table maps each combination of severity, occurrence, and detection to a High, Medium, or Low priority. Severity carries the most weight, so dangerous failure modes always land in a high category.
Can I compare RPNs between two FMEAs?
No, not reliably. Rating scales are calibrated per project and team, so the same number can mean different things. Comparing raw RPNs across analyses is one of the classic misuses.
What should replace an RPN cutoff in practice?
Start from severity, guarantee action on every high-severity mode, then use Action Priority for the rest and document the rationale. The audit trail of decisions matters more than any single number.
Risk priority number · Action Priority · FMEA · All benchmarks → · The resource center →
See this from every format.
Crucible is deterministic reliability engineering: FMEA, Weibull life-data, reliability block diagrams, fault trees and MTBF prediction.