OEE = availability × performance × quality. World-class is 85%, and many plants run nearer 60%.

— overall equipment effectiveness
Availability — Performance — Quality — World-class 85%
Enter values to calculate.
What this number is not One blended number hides as much as it shows: a high OEE building product nobody needs is still waste. Chase the biggest single loss, and never compare OEE across different processes.
Find where the losses live.

A number tells you there is a loss. A schedule tells you what to do about it. Cadence models the line, sequences the fixes, and shows the payoff before you commit a shift to them.

See Cadence →

How it works

The method.

OEE multiplies three rates, availability (uptime), performance (speed), and quality (good units), into one number for how much of the theoretical best a line actually delivers. Each rate is the ratio of what happened to what could have happened at full pace with zero losses.

From raw data the three fall out of one shift. Availability is run time over planned time, where run time is planned time minus downtime. Performance is the ideal cycle time times the total units, over that run time. Quality is good units over total units.

Because the three multiply, small losses compound: three factors at 90% give 72.9%, not 90%. The value is in seeing which of the three is dragging the total down, and naming the loss behind it.

APQOEE
The lowest factor sets the ceiling for the whole.

The formula

The maths, in the open.

OEE = availability × performance × quality

Worked example. An availability of 90%, a performance of 95%, and a quality of 99.9% multiply to 0.90 × 0.95 × 0.999 ≈ 85.4%, just past the world-class line. Raw-data check: 480 planned minutes with 47 down leaves 433 run minutes, so A ≈ 90.2%. At a 1 minute ideal cycle, 400 units should take 400 minutes, so P ≈ 92.4%. With 396 good of 400, Q = 99%. Those multiply to about 82.5%.


Step by step

How to calculate OEE.

  1. Fix the planned production time. Start from scheduled time and subtract only planned stops such as breaks and scheduled maintenance. Everything else counts against you, which is the point.
  2. Calculate availability. Run time divided by planned production time. This captures breakdowns, changeovers and any unplanned stop.
  3. Calculate performance. Total units produced divided by what the ideal cycle time would have produced in the run time. This captures slow running and small stops the log never records.
  4. Calculate quality. Good units divided by total units produced. Rework counts as a loss here, not a recovery.
  5. Multiply the three. OEE is the product, not the average. Three factors at 90% give 72.9%, which is why a plant that looks healthy on each measure can still be losing a quarter of its capacity.

Worked example.

A line is scheduled for 480 minutes and takes 60 minutes of planned breaks, so planned production time is 420 minutes. It stops for 47 minutes unplanned, leaving 373 minutes of run time.

  • Availability: 373 / 420 = 0.888
  • Performance: 18,200 units against an ideal 20,000 for that run time = 0.910
  • Quality: 17,836 good units of 18,200 = 0.980

OEE = 0.888 x 0.910 x 0.980 = 0.792, or 79.2%. Averaging the three would have reported 92.6%, and the gap between those two numbers is the capacity the plant cannot see.

OEE was designed as an improvement diagnostic, not a scoreboard. Its value is in the split: the same 60% can be a machine that stops constantly, one that runs slowly all shift, or one that runs well and scraps a fifth of what it makes, and the three call for completely different responses.

The world-class benchmark usually quoted is 85%, from 90% availability, 95% performance and 99% quality. Treat it as a direction rather than a target, because the number depends heavily on what you agreed to call planned time.

Teams collect the three factors from the same shift log they already keep, then plot them separately rather than plotting OEE alone. The composite hides which of the six big losses is active; the three lines do not.


Watch out

Common pitfalls.

Because the three rates multiply, people overestimate OEE: three 90% factors give 72.9%, not 90%. Inconsistent definitions of available time and ideal cycle also make cross-line comparisons meaningless, so track the trend of one line rather than ranking different ones. And a high OEE spent building unneeded stock is still waste, so read the number alongside real demand.

The most common way OEE gets flattered is by moving losses into planned time. Classify a recurring changeover as scheduled and availability rises without anything on the floor changing. The second is averaging the three factors instead of multiplying them, which turns 90/95/99 into 94.7% rather than the real 84.6%.

Comparing OEE between plants is usually meaningless for the same reason: unless both define planned production time identically, the numbers are not the same measurement.


FAQ

OEE, answered.

What is a good OEE score?

85% is considered world-class. 60% is typical for discrete manufacturing, and below 40% signals significant losses to address.

How is OEE calculated?

OEE is the product of three rates: availability (uptime), performance (speed), and quality (good units). Each is a percentage, and you multiply them.

What is the OEE formula?

OEE = Availability x Performance x Quality. For example, 90% x 95% x 99% = 84.6% overall equipment effectiveness.

Why is my OEE lower than each factor?

Because they multiply. Three factors at 90% give 0.9 x 0.9 x 0.9 = 72.9%, not 90%. Small losses compound.

How do I get OEE from raw shift data?

Availability is run time over planned time. Performance is ideal cycle time times total units over run time. Quality is good units over total units. Multiply the three.

What is the difference between OEE and TEEP?

OEE measures planned production time. TEEP, total effective equipment performance, measures all 168 hours in the week, so it includes the time you chose not to run and answers a capacity question rather than an efficiency one.

Can OEE be over 100%?

No. If it comes out above 100% the ideal cycle time is wrong, usually set from an average rather than the fastest sustained rate the equipment can actually hold.

Is this calculator free?

Yes, free and no signup, running entirely in your browser.



Embed this calculator

Put it on your site, free.

A clean, responsive widget that runs in your visitor's browser, no signup. Pick an accent to match your brand, then copy the snippet. The Conyso mark stays on the widget.

Accent
Powered by Conyso.